by Ben Muir | Oct 6, 2026
The property A substantial mansion block in central London whose combined communal space heating and hot water system was failing, with residents reporting loss of heat and function. The brief Renewing a communal heating system in an occupied block is a six figure...
by Ben Muir | Oct 6, 2026
The property A smaller commercial holding in north London at the end of a ten year lease. The brief The landlord, an estate owner with a portfolio of similar holdings, needed the tenant’s repairing obligations enforced without the costs of the claim swallowing...
by Ben Muir | Oct 6, 2026
The property Multi-floor office premises in an east London town centre, let to a corporate tenant, at the end of the term. The brief The landlord, a property company, needed the tenant’s repairing obligations enforced at lease expiry with a claim that would...
by Ben Muir | Oct 6, 2026
The building A pair of mid nineteenth century stucco houses in a grand terrace in the City of Westminster, Grade II listed and within a conservation area. Five storeys over a basement, rendered solid brick with stone parapets, Ionic porches, balustraded balconies and...
by Ben Muir | Oct 6, 2026
The property A period house in north west London requiring internal and external structural repairs and redecoration, occupied by a private owner throughout. The brief The owner needed the repairs properly specified, competitively priced and professionally supervised,...